User Tools

Site Tools


student_documentation:intro:techinspec

This is an old revision of the document!


Do not come to Tech Inspection until...

  1. Printed technical documentation
  2. OBC Pod and Backbone installed
  3. OBC Battery installed and charged
  4. Main Battery charged
  5. Energy Sensors installed (JM3, GFS, JM2, LFM)
  6. Shutdown Relay connected
  7. Telemetry System verified (OBC Pod LED)
This website uses cookies for visitor traffic analysis. By using the website, you agree with storing the cookies on your computer.More information
student_documentation/intro/techinspec.1530527742.txt.gz · Last modified: 2018/07/02 11:35 by Corina Steffen